Distributed energy for a region

A long-term programme of small modular reactors and grid infrastructure — not a quick pilot, but a national energy project.

Pilot CAPEXfrom $0.6–0.7B for modules in a city scenario
Operating cost$24–28M/year for 12–14 modules
Pilot impact12–14 modules · 3.97–4.64 TWh/year
LOCAL RESILIENCE HUB / 001WATER · HEAT · SIGNAL · CARE
01 / THE MODEL

How it works

Under the Copenhagen Atomics model, one announced module provides 42 MW electric, 100 MW thermal, a target 90% capacity factor, a $50M module price and $2M annual service. A preliminary Dnipro scenario used 12–14 modules for a 400–500 MW peak, or $600–700M for modules alone. This is not full CAPEX: site, protected structures, turbines, grid connection, staff, licensing, waste management, security and decommissioning are additional. For an entire oblast the scale is much larger. The site therefore presents this as a strategic direction for the state, the nuclear operator and an international consortium — not as a municipal launch promise. Economic model: 12 modules produce about 3.97 TWh per year; 14 modules produce 4.64 TWh. Formula: annual operating surplus = generation × (long-term contract price + captured network saving − target all-in cost). Conservative case $50 + $10 − $40 = $20/MWh: about $79.5M per year for 12 modules and simple payback of 11.3–15.1 years on an assumed full CAPEX of $0.9–1.2B. Base case $70 + $20 − $35 = $55/MWh: about $218.5M per year and 4.1–5.5 years. Upper case $90 + $30 − $30 = $90/MWh: about $357.6M per year and 2.5–3.4 years. For 14 modules, generation and surplus scale proportionally if costs also scale linearly. This is before financing, tax, reserves, outages and decommissioning; network savings can be monetized only through direct contracts, a local microgrid or another permitted supply model.

01

validate the hourly demand profile and reserve margin

02

prepare techno-economic and safety cases

03

align the technology with the regulator, EIA and grid operator

04

prepare a site and financing roadmap

02 / INVESTOR CASE

A measurable local asset

The pilot starts with a clear service unit, operating budget and impact metric. The same playbook can be adapted to another community after validation.