Distributed energy for a region
A long-term programme of small modular reactors and grid infrastructure — not a quick pilot, but a national energy project.
How it works
Under the Copenhagen Atomics model, one announced module provides 42 MW electric, 100 MW thermal, a target 90% capacity factor, a $50M module price and $2M annual service. A preliminary Dnipro scenario used 12–14 modules for a 400–500 MW peak, or $600–700M for modules alone. This is not full CAPEX: site, protected structures, turbines, grid connection, staff, licensing, waste management, security and decommissioning are additional. For an entire oblast the scale is much larger. The site therefore presents this as a strategic direction for the state, the nuclear operator and an international consortium — not as a municipal launch promise. Economic model: 12 modules produce about 3.97 TWh per year; 14 modules produce 4.64 TWh. Formula: annual operating surplus = generation × (long-term contract price + captured network saving − target all-in cost). Conservative case $50 + $10 − $40 = $20/MWh: about $79.5M per year for 12 modules and simple payback of 11.3–15.1 years on an assumed full CAPEX of $0.9–1.2B. Base case $70 + $20 − $35 = $55/MWh: about $218.5M per year and 4.1–5.5 years. Upper case $90 + $30 − $30 = $90/MWh: about $357.6M per year and 2.5–3.4 years. For 14 modules, generation and surplus scale proportionally if costs also scale linearly. This is before financing, tax, reserves, outages and decommissioning; network savings can be monetized only through direct contracts, a local microgrid or another permitted supply model.
validate the hourly demand profile and reserve margin
prepare techno-economic and safety cases
align the technology with the regulator, EIA and grid operator
prepare a site and financing roadmap
A measurable local asset
The pilot starts with a clear service unit, operating budget and impact metric. The same playbook can be adapted to another community after validation.
Fund the pilot